Go to Global Site

0

Sign in

  • Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Black, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g

    (UK-WOOD-Q003-23x8mm-10-LF)
  • Price/Package: 13,13€
  • Sorry, the item is temporarily removed from PandaHall because it's out of stock.
    If you have any questions, please feel free to contact us.

Description:

Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Black

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Related Categories

Wood & Nut Beads
Wood Beads(15)

Confirm

Please Note

OK